Lot 2-2019 – Photovoltaic Solar Power Plant
by Montechoro II
Customer: Iberdrola Renewables Portugal, S.A. / Frequent Summer, Ltd.
The Montechoro II Photovoltaic Solar Power Plant project, materializes Lot 2, of the 1st Competitive Procedure for Allocation of Injection Capacity Reserve in the Public Service Electricity Grid, for Photovoltaic Solar Energy, carried out by DGEG in 2019
The project is located in the parish of Paderne, in the municipality of Albufeira, occupies an area of 31.8 ha and includes the installation of 46,200 photovoltaic panels of 540 Wp, with a total installed power of 24.95 MWp and a connection power to the 20 MVA grid, 14 1,690 kW/kVA inverters, 4 transformer centers, three with 6,760 kVA, and one with 5,070 kVA, a 20.0 MVA (30kV-60kV) lifting substation and a high voltage line at 60 KV with an extension of 4,110 m.Summary of Services Provided
- Study of Analysis of Constraints;
- Requests for Localization Reports to Entities;
- Study of Prior Appreciation for the decision to be included in the RJAIA, by the APA;
- Visibility Study;
- Environmental Impact Study (APA);
- Application for Cutting/Engagement of Tree Species of Protected Species, with the ICNF;
- Request for Attribution of Production License, with DGEG;
- Environmental Monitoring Plan for the Work (PAAO);
- Plan for Management and Control of Invasive Alien Species (PGCEE);
- Waste Management Plan;
- Landscape Integration Plan;
- Soil Monitoring Plan;
- Environmental Monitoring of Construction.
Licenses obtained
- Declaration of Environmental Impact (DIA) and Single Environmental Title (TUA), issued by the APA;
- Authorization for Cutting/Uprooting Tree Species of Protected Species, issued by ICNF;
- Production License, issued by DGEG.