Lot 10-2019 – Conde Photovoltaic Solar Power Station
Client: Iberdrola Renewables Portugal, S.A. / Frequent Summer, Ltd.
The Conde Photovoltaic Solar Power Plant project, materializes Lot 10, of the 1st Competitive Procedure for Allocation of Injection Capacity Reserve in the Public Service Electricity Grid, for Photovoltaic Solar Energy, carried out by DGEG in 2019.
The project is located in the parish of Quinta do Anjo, in the municipality of Palmela, occupies an area of 19.9 ha and includes an installation with 25,020 photovoltaic panels, with a unit power of 540 Wp. Peak installed power is 13.51 MWp and grid connection power is 10 MVA. The installation includes 8 inverters of 1,637 kVA, 2 transformer centers of 6,560 kVA, a sectioning station and a medium voltage line at 15 kV, with a length of 6,300 m.Summary of Services Provided
- Study of Analysis of Constraints;
- Requests for Localization Reports to Entities;
- Study of Prior Appreciation for the decision to be included in the RJAIA, by the APA;
- Application for Cutting/Engagement of Tree Species of Protected Species, with the ICNF;
- Prior notice from REN;
- Application for Title of Use of Water Resources;
- Application for Attribution of Production License, with DGEG.
Licenses obtained
- Favourable opinion issued by the APA of decision not to submit the project to RJAIA;
- Title for the Use of Water Resources (TURH);
- Authorization for Cutting/Uprooting Tree Species of Protected Species, issued by ICNF;
- Declaration of Economic and Social Interest;
- Favourable opinion issued by CCDR LVT, on the compatibility of the project with the RJREN;
- Production License, issued by DGEG.